Skip to main content
Office Renovations

Commercial Service

Office Renovations in Calgary

Modern Calgary office renovations — partitions, glass, HVAC, lighting, and millwork finished on schedule and after-hours when needed.

Overview

Calgary’s office renovations contractor

A Calgary office renovation has to land on schedule and keep the business open. We rework floor plates, drop new partitions, run cable management, swap lighting for current LED standards, update HVAC zoning, and install glass storefronts and meeting-room walls — all in a sequence that minimizes downtime.

Most office projects in Calgary are CCDC-2 tenant improvements: landlord-approved scope, fixed-price contract, milestone draws tied to inspection sign-offs. We work after-hours and weekends where the lease requires it, and we close out the permits and commercial workmanship warranties before final invoice.

Why Choose Us

Why Calgary businesses pick our team

Keep your business open

We schedule loud and dusty work for evenings and weekends, seal the work zone, and run negative-pressure containment so the rest of the floor keeps operating.

Landlord-approved scope

CCDC-2 contracts, certificates of insurance, and PM-handled landlord sign-offs. Your lease admin doesn’t chase paperwork.

Permits and inspections handled

Building, electrical, mechanical, and gas permits pulled. Inspections coordinated and signed off before final invoice.

Cable + IT coordinated

Rack rooms, patch panels, cable trays, and structured cabling installed to your IT vendor’s spec.

What’s Included

Every office renovations project includes

  • Demising walls, glass partitions, meeting rooms
  • Cable management and IT closet build-outs
  • HVAC zoning and re-balancing
  • LED lighting and code-compliant electrical
  • Carpet, LVP, and porcelain tile flooring
  • After-hours and weekend work scheduled

How It Works

Our office renovations process

  1. Step 01

    On-site walk + lease review

    We walk the space, review your lease’s alterations clause, and confirm landlord approval requirements before quoting.

  2. Step 02

    CCDC-2 proposal + landlord sign-off

    Line-item proposal, drawings, schedule, and documentation packaged for landlord approval before deposit.

  3. Step 03

    Build + handover

    After-hours work scheduled. Inspections booked. Final walkthrough with you and the landlord.

Free On-Site Estimate

Tell us about your space — we'll come measure, scope, and price it within one business day.

We reply within one business day. Your details stay private.

Frequently Asked

Questions, answered

How much does an office renovation cost in Calgary?

Calgary office renovations typically run $75–$200 per square foot depending on finish level, partition density, and mechanical work. Light cosmetic refreshes (paint, carpet, lighting) start lower; full reconfigurations with new electrical and HVAC trend higher.

How long does an office renovation take?

Most Calgary office tenant improvements run 4–10 weeks of construction, plus 2–4 weeks of design, permitting, and landlord sign-off. We schedule loud work after-hours when the lease requires it.

Do you work after hours and weekends?

Yes — we routinely run evening and weekend shifts for retail, healthcare, and Class A office tenants who can’t shut down operations. Premium for off-hours work is quoted in the line-item proposal.

Who handles the landlord approvals?

We do. CCDC-2 paperwork, certificates of insurance, building system tie-in requests, and final sign-off — all packaged and submitted by our PM.

Can you coordinate with my IT vendor?

Yes — cable tray, rack room, patch panels, and structured cabling are installed to your IT vendor’s spec, with their pull dates scheduled alongside our trades. We’ve worked alongside every major Calgary IT integrator.

Ready to start your office renovations?

Book a free on-site consultation. We reply within one business day.